NTPC Vidyut Vyapar Nigam Limited, plans to develop a grid-connected 100 MW solar photovoltaic project and has floated a tender for its engineering, procurement, and construction (EPC), along with land. The land must be transferred or leased to NVVN.
The last date to submit bids is December 20, 2021. Bids will be opened on the next day.
The scope of work is design, engineering, manufacturing, supply, packaging, forwarding, transportation, unloading, storage, installation, and commissioning of grid-connected solar projects. After commissioning these projects, comprehensive operation and maintenance services for three years are to be provided.